- Home
- Departments
- Economic Development
- Economic Impact Information and Anlysis
Create a Website Account - Manage notification subscriptions, save form progress and more.
In early 2018, the Town issued a RFP for a parking study and analysis for the downtown area. The consultant, Wells + Associates completed their analysis and presented the results to the Board of Trustees in 2018. The analysis and results are posted online here.
Traffic Analysis 2019
In 2019, the Town issued a RFP to study traffic volume through the Town. The study was conducted in July 2019, during the busy summer months and the results from the traffic analysis, which was completed by Wells + Associates, were presented to the Board of Trustees in September 2019, and are posted online here.
The consultants also created a one page document with the highlights.
Hotel Feasibility Study 2020
In 2019, the Town issued a RFP for a hotel feasibility analysis within the Town. The results from the feasibility study which was completed by Place Dynamics, were presented to the Board of Trustees in March 2020, and are posted online here.
In 2022, the Town worked with a consulting firm to review three areas within the town regarding
1) adding curb, gutter, safety improvements and parking along Railroad Ave
2) crosswalk signage improvements and traffic counts along Stone Canyon as well as
3) the feasibility of meeting criteria to add a flashing crosswalk notification sign at Railroad Ave and SH-7 which was required by CDOT since SH-7 is their right of way.
The results of all three studies were presented to the Board of Trustees in a workshop on September 6, 2022.